---
title: "Cleanrooms, industrial HVAC, service | Clima Line Katowice"
description: "We design, build and service ISO 5–8 cleanrooms, refrigeration and process ventilation for manufacturing plants. Katowice, all of Poland, 100+ projects."
url: "https://clima-line.pl/en/"
lang: en
source: Clima Line, clima-line.pl
---

[ ENGINEERING FOR INDUSTRY ]We are Clima Line. We combine engineering, construction and service to create the conditions for your production to grow.

# We create the conditions.You create *the future.*

## They trusted us.

Brands we have worked for.

- [![Saint-Gobain](https://clima-line.pl/trust/logo-saint-gobain-opt.png)](https://clima-line.pl/en/reference/#saint-gobain)
- [![Danone](https://clima-line.pl/trust/logo-danone-opt.png)](https://clima-line.pl/en/reference/#danone)
- [![Mubea](https://clima-line.pl/trust/logo-mubea-opt.png)](https://clima-line.pl/en/reference/#mubea)
- [![Antolin](https://clima-line.pl/trust/logo-antolin-opt.jpg)](https://clima-line.pl/en/reference/#antolin)
- [![PGE](https://clima-line.pl/trust/logo-pge-opt.png)](https://clima-line.pl/en/reference/#pge)
- [![HAGS](https://clima-line.pl/trust/logo-hags-opt.png)](https://clima-line.pl/en/reference/#hags)
- [![Gobarto](https://clima-line.pl/trust/logo-gobarto-opt.png)](https://clima-line.pl/en/reference/#gobarto)
- [![Bama](https://clima-line.pl/trust/logo-bama-opt.png)](https://clima-line.pl/en/reference/#bama)
- [![Anbud](https://clima-line.pl/trust/logo-anbud-opt.png)](https://clima-line.pl/en/reference/#anbud)
- [![Argon](https://clima-line.pl/trust/logo-argon-opt.png)](https://clima-line.pl/en/reference/#argon)

- 
- 
- 
- 
- 
- 
- 
- 
- 
- 

> “We can recommend Clima Line with full confidence as a reliable business partner.”

From concept.

To *continuous production.*

## Behind every installation is *your business.*

Stable temperature. The right humidity. Clean air. To us, these are specific parameters. To you, they mean product quality, efficient production and cost control. Around 20 people in the design office and on site, licensed to design, build and operate installations; we work with specialists from the academic staff of Wrocław University of Science and Technology.

## Engineering. *In practice.*

Real challenges.
Solutions matched to the process.

### An environment for precision.

400 m² · 5 AHUs · 800 kW chiller · H14

### Air in service of the process.

Process ventilation · extraction · HVAC

### Technology that holds its parameters.

Tempering plant · cooling · environmental control

## From the first question. *To the last detail.*

ISO 5–8 cleanrooms: process design, HVAC with HEPA H13/H14 filtration, a 10–15 Pa pressure cascade, IQ/OQ/PQ validation. A 200–500 m² ISO 7 room in 12–20 weeks.

Chilled water systems at 7/12 °C, chillers up to several hundred kW, free cooling, hall cooling. Sized from the heat balance and load profile, not from the sum of nameplates.

Local exhaust, dust extraction, fumes and VOC, oil mist, ATEX designs. Extraction designed with the air balance of the building, make-up air and heat recovery.

Instrumentation and control, PLC/DDC, visualisation and trend logging, Modbus, BACnet, M-Bus and OPC UA integration. Pressure cascade and early-warning alarms in cleanrooms.

Inspections twice a year, leak checks every 12/6/3 months, SLA contracts with the response time set separately for each system. Over 1 000 units under our care.

## Trust that comes *with proof.*

Excerpts from published letters.
Every opinion is backed by a specific document.

> We can recommend Clima Line with full confidence as a reliable business partner.

> The tasks entrusted to the company were completed to a high technical standard.

> The company is characterised by responsibility, availability and flexibility.

## Great things start with *a good question.*

Describe the process, facility and parameters.
An engineer replies, not a sales team.
