Case study / ARTICLE

# Case study: a 400 m² ISO 7 cleanroom for an automotive production line

## 1. Starting point

Our automotive client was launching a new production line requiring a precisely controlled working environment. The process demanded: full control of particulate contamination, stable temperature and humidity, room overpressure of minimum 15 Pa, ISO 7 cleanliness (Cleanroom class 10,000), and 24/7 continuity under variable production loads.

The zone covered approximately **400 m²**, divided into several functional rooms with different airflow and pressure requirements.

## 2. Key engineering challenges

Audits and analyses showed that success would depend on: designing an air system with a very large airflow (above 100,000 m³/h) while keeping the pressure balance; using absorption dehumidifiers to hold the humidity parameter regardless of weather; providing cooling capacity with genuine reserve; and achieving class-compliant filtration with a workable service regime.

## 3. The delivered system

### Air handling and dehumidification

The system delivers a total airflow above **100,000 m³/h**, with **absorption dehumidifiers rated 18,000 m³/h** holding stable humidity independent of outdoor conditions, critical for PVB film processing.

### An 800 kW chilled water plant

The cooling system provides stable medium temperature under all conditions, capacity for high loads, a power reserve for future line expansion, and high energy efficiency in round-the-clock operation. It is equipped with an emergency by-pass, flow and temperature protections, and dedicated circuits for the air handling units and the process.

### Filtration and class 10,000 cleanliness

With final **H14 filtration**, correct airflow distribution and room overpressures, the zone achieves stable ISO 7 cleanliness to the client’s requirements.

## 4. Key technical data

- Zone area: approx. 400 m²
- Cleanliness class: Cleanroom 10,000 / ISO 7
- Total airflow: above 100,000 m³/h
- Absorption dehumidifiers: 18,000 m³/h
- Chilled water plant: 800 kW
- Final filtration: H14
- Overpressure regime: per EN ISO 14644

## 5. The outcome

The result is a stable class 10,000 production environment meeting strict automotive requirements. The system holds its parameters 24/7, and its capacity reserves allow production to scale in the coming years. The project demonstrates that properly engineered HVAC directly affects product quality, line throughput and operating costs.

## 6. Planning a similar investment?

If your plant is planning a new cleanroom zone, a retrofit of existing infrastructure, or stabilisation of air parameters for automotive, battery, pharma or electronics processes, we deliver such projects end to end. See our [turnkey cleanroom construction](https://clima-line.pl/en/cleanroom-construction-poland/) page or call [+48 32 450 56 66](tel:0048324505666).

An article from the Clima Line archive. Data and references reflect the content as published on the date shown.

READ NEXT

## More from this *perspective.*

Case study

### Sputnik system: thermal disinfection of livestock trailers against ASF (case study)