title: "Client references: 15 reference letters | Clima Line"
description: "15 reference letters: Saint-Gobain, Danone, Mubea, PGE, KGHM, HAGS, Antolin. Design, construction and service of HVAC, refrigeration and cleanrooms."
url: "https://clima-line.pl/en/reference/"
lang: en
source: Clima Line, clima-line.pl
---

# Our work. *Their words.*

Cooperation confirmed in writing. Read the letters from companies for which we designed, built and serviced installations.

## Reference letters

15 documents from our archive

### Saint-Gobain Innovative Materials Polska

Design and supply of a pre-lamination furnace for laminated glass; cooperation on cleanroom and HVAC work.

### Energetyka · KGHM Group

Design review, installation works, commissioning and documentation of the HVAC system.

Document date: 04.11.2024

### PGE GiEK · Turów Power Plant

Energy efficiency assessment of air-conditioning equipment in production buildings.

Document date: 07.02.2019

### Danone

Installation of ventilation and air-conditioning systems.

### Mubea Automotive Poland

Design, installation and modernisation of ventilation, cooling and air-conditioning systems.

Document date: 18.05.2017

### HAGS Poland

Design, installation and service of building services, plus engineering support.

Document date: 11.01.2019

### Przedsiębiorstwo Budowlane Anbud

Design, installation and service of ventilation, cooling and air-conditioning systems.

Document date: 20.02.2017

### Saint-Gobain · Service

HVAC service, equipment register, inspection schedules and maintenance procedures.

### Argon

Design, installation, assembly and service work on HVAC systems.

Document date: 14.02.2017

### Zakłady Tłuszczowe Kruszwica

Rapeseed oil cooling: chiller selection and installation of the chilled water system in Brzeg.

### Okręgowa Spółdzielnia Mleczarska w Skale

Detailed design of mechanical supply and exhaust ventilation with heat recovery.

Document date: 23.10.2020

### Bau Serwis · Radisson Blu Wrocław

Reference from Bau Serwis for replacing the chiller and circulation pumps at the hotel.

Document date: 19.10.2020

### Bama Europa

Ventilation and air dehumidification in the production area, plus service of the completed system.

Document date: 10.03.2020

### Antolin Silesia

Inspection of refrigeration equipment, diagnostics and measurement of pump and fan operation.

Document date: 12.10.2020

### Agro Gobarto · FERMA-POL

Rebuild of the heat substation for the process needs of the plant in Zalesie.

Document date: 16.10.2020

Archive documents, previously published on the [Clima Line website](https://clima-line.pl/referencje/). Company names and dates are kept as they appear in the letters.