
Saint-Gobain Innovative Materials Polska
Design and supply of a pre-lamination furnace for laminated glass; cooperation on cleanroom and HVAC work.
Read the full document (new tab)Cooperation confirmed in writing. Read the letters from companies for which we designed, built and serviced installations.
15 documents from our archive

Design and supply of a pre-lamination furnace for laminated glass; cooperation on cleanroom and HVAC work.
Read the full document (new tab)
Design review, installation works, commissioning and documentation of the HVAC system.
Document date: 04.11.2024
Read the full document (new tab)
Energy efficiency assessment of air-conditioning equipment in production buildings.
Document date: 07.02.2019
Read the full document (new tab)
Installation of ventilation and air-conditioning systems.
Read the full document (new tab)
Design, installation and modernisation of ventilation, cooling and air-conditioning systems.
Document date: 18.05.2017
Read the full document (new tab)
Design, installation and service of building services, plus engineering support.
Document date: 11.01.2019
Read the full document (new tab)
Design, installation and service of ventilation, cooling and air-conditioning systems.
Document date: 20.02.2017
Read the full document (new tab)
HVAC service, equipment register, inspection schedules and maintenance procedures.
Read the full document (new tab)
Design, installation, assembly and service work on HVAC systems.
Document date: 14.02.2017
Read the full document (new tab)
Rapeseed oil cooling: chiller selection and installation of the chilled water system in Brzeg.
Read the full document (new tab)
Detailed design of mechanical supply and exhaust ventilation with heat recovery.
Document date: 23.10.2020
Read the full document (new tab)
Reference from Bau Serwis for replacing the chiller and circulation pumps at the hotel.
Document date: 19.10.2020
Read the full document (new tab)
Ventilation and air dehumidification in the production area, plus service of the completed system.
Document date: 10.03.2020
Read the full document (new tab)
Inspection of refrigeration equipment, diagnostics and measurement of pump and fan operation.
Document date: 12.10.2020
Read the full document (new tab)
Rebuild of the heat substation for the process needs of the plant in Zalesie.
Document date: 16.10.2020
Read the full document (new tab)Archive documents, previously published on the Clima Line website. Company names and dates are kept as they appear in the letters.
LET’S START WITH YOUR PROCESS
Describe what your production needs: facility, parameters, deadline.
An engineer replies, not a sales team.